Article 36 Engine Rebuild Part 3

Last month's article addressed rebuilding the Jaguar XK engine. Since there is a lot to discuss regarding engine
rebuilds we are continuing with a third article. As we discussed last month, my engine is a 4.2 litre XK engine for my
1967 E-Type 2+2. Dis-assembly of the engine revealed damage to the combustion chambers, rings, pistons, and
cylinder walls. I decided to send the engine to Dick Maury at Coventry West for a professional rebuild, not to mention
repair of the damaged parts so that I could continue with a "numbers matching" engine combination. When we left off
in last month's article, Dick had finished installation of the crankshaft into the block.

At this point, the block is almost ready for installation of the pistons and connecting rods. As we discussed previously,
the bore of each cylinder had already been enlarged by a set amount (called an "oversize") and the surface of each
cylinder wall prepared with a precise surface finish using a "hone block". This surface finish is a key element of engine
break-in, as it allows the surface to wear down ever so slightly to accommodate the exact shape of the piston rings.
Speaking of the piston rings, new rings are inserted into the grooves of the new pistons. The gap between the ends of
the piston rings is checked, as well as the side clearance of the rings in the machined grooves on the pistons. A bad fit
might mean starting over with new pistons or rings but better now than having a smoky engine down the road!

Next the piston rods can be fit to the pistons. For my engine, Dick used reconditioned rods from XJ6 engines, which
are of a slightly stronger design. The rods engage the pistons via the wrist pin. The clearances and fit of the wrist pin to
both the rod and the piston are verified to be within spec. Once all six piston and rod assemblies are complete, it's
time to install them in the cylinder bores. The bores are slathered with lubricant and the rings are compressed tightly
around the pistons using a ring compressor. The ring compressor will compress the rings to a diameter slightly smaller
than the cylinder bore, allowing them to be tapped gently down into the bore from the top using a mallet. Once the far
end of the rod gets near the crankshaft, they open end of the rod is slipped over its corresponding crankshaft journal.
The bearing shells and the journal are also slathered with assembly lubricant. Finally, the rod bearing cap is installed
on the opposite side of the journal and its retaining nuts started. Dick uses new rod studs and nuts, which also has the
benefit of eliminating the older design castellated nut that used cotter pins, which could come loose and create havoc
in the engine. The nuts are torqued to spec. Repeat for the other five cylinders and that part is done!

All of this time, the block has been mounted on an engine stand, which holds it up at a convenient work height and
allows it to be rotated as required. Spinning the block upright, new studs can be installed into the block, which will
shortly be used to attach the head. With the block inverted, the oil pump and its associated pick-up hardware can be
installed. Dick installs a new oil pump and makes sure all the connections are tight. Also, the gears that drive the
distributor are put into place.

The overhead cams on the XK engine are driven off the crankshaft by the lower and upper timing chain assembly.
Typically new timing chains are used along with the existing gears and mounting brackets. After being mocked up on
the bench, the entire assembly can be hung from its sprocket on the front of the crankshaft. Not shown in these pictures
are new timing chain guides and tensioners. At this point, the freshly cleaned oil pan can be installed. Finally, the front
timing cover, the front crankshaft oil seal, water pump, harmonic balancer, and pulley sheave can be re-installed. Of
course, new gaskets are used at all of the critical sealing surfaces, along with the correct gasket sealant products.

At this point, the engine is ready for the re-furbished head. Since I am about out of space for this month and I don't want
to short change the discussion of the head, I'll finish up for now with a shot of the head cleaned up and ready to be
installed. Next month we'll discuss what measures were taken to get the head ready for fast motoring.

New pistons, re-conditioned XJ6 rods
Top of the block, pistons installed, head studs installed
Block flipped upside down, showing crank. oil pump, and associated tubing
Block upside down, lower and upper timing chains loosely installed
Closeup of cam drive off of nose of the crankshaft
Front of engine, pretty much complete with crankshaft damper, water pump, timing
chain cover, oil pan all installed